This week: 2 new, 1 resized, 0 removed.

RefOpeningLevelPasses throughThkServicesLaggingThis week
BW-01700 × 400L09Blockwork wall215Supply air 600 × 30025 mineral woolNo change
BW-01700 × 400L09Blockwork wall215Extract air 600 × 300NoneNo change
BW-02400 × 150L09Blockwork wall215Cable tray 300NoneNo change
BW-03Ø200L09Plasterboard partition125LTHW flow and return 2 × 5425 phenolicNo change
BW-04Ø150L09Blockwork wall215LTHW flow 10025 phenolicResized
BW-05250 × 250L09Concrete core wall300CWS 42, HWS 3520 nitrileNo change
BW-06Ø110L10Concrete slab250Soil 100NoneNo change
BW-07300 × 300L10Concrete slab250CWS 54, HWS 4220 nitrileNew
BW-08500 × 200L10Concrete slab250Cable tray 450NoneNew

Same size, same reference: BW-01 appears twice because two ducts share that opening size. In the real issue every row carries its Revit element ID, so a person can go straight to it in the model.

And the notes a person writes.

Check

BW-04 grew from Ø125 to Ø150

The LTHW flow went up a size this week. The opening now allows for 25 mm lagging all round.

Typical floors

Levels 11 to 14 still match

Listed once. Level 15 now differs by two openings, so it is listed on its own.

Want one for your model?